Re:Dawson Pde rail crossing traffic jams Posted on 07/11/201107/11/2011 by Lulubelle Delay time on boomgates at Grovely level crossing is being reduced by 30 seconds. This will allow approximately 14 more vehicles to cross Dawson Parade in that time. No details on when the changes take place. Spread the love Posted in Local Transport |